On site — all diaries

Plopsaqua De Panne

Interior rockwork and façades built for a permanently humid, chlorinated indoor environment, installed inside a finished building.

Site
Plopsaqua De Panne
Scope
Interior rockwork, façades
Signature
Indoor rock under glass roof
Constraint
No outdoor craning, tight access
Interior rockwork and façades inside Plopsaqua De Panne water park
Plopsaqua De PanneDe Panne, Belgium. Interior rockwork · Façades.

The diary

  1. Steel armature being built on a Universal Rocks rockwork site
    The rock exists in steel long before it exists in stone.
    01Phase 1

    Setting out and steelwork

    Steel is carried in through finished doors and assembled inside — there is no craning over the roof.

  2. Shotcrete being sprayed over armature to form themed rockwork
    Shotcrete is sprayed and shaped in the same movement.
    02Phase 2

    Shotcrete

    Mixes and reinforcement are specified for constant humidity and chlorine, with drainage falls built into every horizontal surface.

  3. Universal Rocks sculptor carving wet shotcrete into rock texture
    Texture is cut by hand, against the clock of the setting concrete.
    03Phase 3

    Carving, wet

    Sculptors work behind the spraying crew while the material is still workable, cutting fractures, strata and tool marks in the round. Each face is carved once, in place.

  4. Themed façades integrated into hand-carved rockwork
    Buildings grow out of the rock, not in front of it.
    04Phase 4

    Façades and details

    Themed buildings, timber, plaster and ironwork are built into the same surface, so the architecture and the rock read as one set rather than as decor placed against a backdrop.

  5. Water feature integrated into Universal Rocks themed rockwork
    Water is tested full-scale before a single coat of paint.
    05Phase 5

    Water, planting and integration

    Basins, waterfalls and submerged structures are tested and adjusted, then planting is threaded into pockets left in the rock so vegetation and stone age together.

  6. Hand-painted finished rockwork ready for handover
    The last layer is the one that decides whether it looks real.
    06Phase 6

    Painting and handover

    Painting is done under artificial light, then checked again under the daylight coming through the roof.